The 80,000 m3/h air separation equipment invested by hangyang group in guangxi hangyang shenglong (the first set in China) was put into operation in August 2013. The air cooling and water cooling towers of the 80,000 air separation equipment were manufactured by mex machinery, and finally reached the destination by water transportation